
Drangsvann OBOS BB3
January 15, 2026
Bryggebyen – Building stage 4
January 16, 2026Brunla Solar Power Plant – Skagerak Energi
Client: Skagerak Energi AS
Year: 2025
Country: Norway
Brunla Solar Power Plant is a planned ground-mounted solar energy facility located in Larvik municipality. With an installed capacity of approximately 24.5 MWp and an estimated annual production of 26 GWh, the project will contribute renewable energy equivalent to the electricity consumption of around 1,600 households. The development is part of Skagerak Energi’s broader effort to strengthen local, renewable power generation through transparent planning and early stakeholder involvement. (skagerakenergi.no)
Our role in the project was to establish an interactive digital platform used throughout the planning process, enabling improved communication and a clearer understanding of the project for stakeholders and the public. In addition, a cinematic film was produced directly from the 3D model, providing an accessible and engaging visualization of the proposed solar power plant, which can be viewed below.







